<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
    <channel>
        <title>Bute Inlet Hydroelectric Project</title>
        <description>Plutonic Power Corporation&apos;s Hydroelectric Project will Produce 914MW through 3 groups of interconnected hydro facilities.</description>
        <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_316.html</link>
        <docs>http://blogs.law.harvard.edu/tech/rss</docs>
        <lastBuildDate>Mon, 23 Jun 2008 11:32:48 -0700</lastBuildDate>
        <pubDate>Wed, 16 Apr 2008 10:46:24 -0700</pubDate>
        <generator>FeedForAll v2.0 (2.0.2.9) unlicensed version http://www.feedforall.com</generator>
				<item>
	<title>Bute Inlet Hydroelectric Project -Open House and Public Comment Period  </title>
	<description>New Public Open House in Campbell River on Monday 2 February 2009. Public comment invited on the Draft Terms of Reference for the Proposed Bute Inlet Hydroelectric Project (from Jan 19 - Feb 18, 2009).</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_document_316_27479.html</link>
	<pubDate>Tue, 20 Jan 2009 17:00:00 </pubDate>
	</item>
			<item>
	<title>Bute Inlet Hydroelectric Project - Open Houses and Invitation to Comment</title>
	<description>The public is invited to obtain information about and comment on the draft Terms of Reference which will specify the studies to be conducted and the detailed information to be provided in the Application at two open house locations. Also, a 30 day public comment period on the draft Terms of Reference will start on January 19, 2009 and end at midnight February 18, 2009. All comments received during this comment period in relation to the Terms of Reference will be considered. </description>
	<link>http://a100.gov.bc.ca/pub/epic/apps_data/p316/1231281791577_9bbeef272f417fe380ca800d82d32f1080cc4b5f32110d94884813950edc0838.pdf</link>
	<pubDate>Tue, 05 Jan 2009 15:41:00 </pubDate>
	</item>
        <item>
            <title>Bute Inlet Hydroelectric Project - EAO Information Website</title>
            <description>Plutonic Power Corporation&apos;s Hydroelectric Project will produce 914MW through 3 groups of interconnected hydro facilities.</description>
            <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_316.html</link>
            <author>eaoinfo@gov.bc.ca</author>
            <category domain="">Pre-Application</category>
            <guid isPermaLink="false">8A4266EA-A819-47A3-A8E7-5B09CD08E4FE</guid>
            <pubDate>Wed, 16 Apr 2008 10:43:48 -0700</pubDate>
        </item>
    </channel>
</rss>

