<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
  <channel>
    <title>Mica Generating Station Unit 6</title>
    <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_321.html</link>
    <description>BC Hydro is proposing to install an approximately 500 MW turbine into an existing turbine bay at the Mica Generating Station.</description>
    <webMaster>eaoinfo@gov.bc.ca</webMaster>
    <generator>mirabyte Feed Writer 1.0</generator>
    <pubDate>Fri, 18 Apr 2008 16:17:58 -0800</pubDate>
    <lastBuildDate>Mon, 23 Jun 2008 15:01:28 -0800</lastBuildDate>
	
			<item>
	<title>Ministers' Decision to Issue a Certificate</title>
	<description>BC Hydro has received an Environmental Assessment Certificate for the Mica Generating Station Unit 6 Project.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_doc_list_321_c_waa.html</link>
	<pubDate>Thu, 8 Apr 2010 12:28:00 </pubDate>
	</item>
	
		<item>
	<title>Public Comment Period Closed </title>
	<description>The proposed Mica Generating Station Unit 6 project’s public comment period regarding the application has now closed. The EAO posts all the public comments it receives and the proponent’s responses to those comments. </description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_doc_list_321_r_pub.html</link>
	<pubDate>Mon, 26 Oct 2009 10:35:00 </pubDate>
	</item>
	
			<item>
	<title>Application for an Environmental Assessment Certificate</title>
	<description>The Environmental Assessment Office has formally accepted an Application from BCHydro for an environmental assessment certificate for the proposed Mica Generating Station Unit 6 Project on the basis that the Application contains the information required by the Terms of Reference. The Application review process has begun</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_document_321_31486.html</link>
	<pubDate>Wed, 02 Sep 2009 12:00:00 </pubDate>
	</item>
		
			<item>
	<title>Public Comment and Open House on Application</title>
	<description>The public is invited to obtain information about and comment on the application for an environmental assessment certificate for the proposed project. Open houses will be held in Seymour Arm, Revelstoke, Golden, and Valemount. A 45 day public comment period on the application will start on September 9, 2009 and end at midnight on October 24, 2009. All written comments received during this time period will be considered.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p321/1251836210466_287ca2eaef47cfd938def26afc0fa46a9396dea8c6ebf4d774915291254e4bc7.pdf</link>
	<pubDate>Wed, 02 sep 2009 12:00:00 </pubDate>
	</item>
	
    <item>
      <title>Section 11 Order</title>
      <description>The EAO has issued a Section 11 order which sets out the formal scope, procedures and methods for the environmental assessment.</description>
      <link>http://a100.gov.bc.ca/pub/epic/apps_data/p321/1225211414874_8e248a8d30d98d5e7d640d104dcc9a52e98eb04d72c9.pdf</link>
      <pubDate>Wed, 29 Oct 2008 08:22:02 -0800</pubDate>
    </item>
	
    <item>
      <title>Draft Terms Of Reference</title>
      <description>The public is invited to obtain information about and comment on the draft Terms Of Reference which will specify the studies to be conducted and the detailed information to be provided in the Application at several open house locations. A 30 day public comment period on the draft Terms Of Reference will start on October 29th, 2008 and end at midnight November 28th, 2008. All written comments received during this time period will be considered.</description>
      <link>http://www.eao.gov.bc.ca/projects/mica5_6/index.html</link>
      <pubDate>Tue, 21 Oct 2008 17:11:45 -0800</pubDate>
    </item>
	
    <item>
      <title>Open House and Public Comment Period</title>
      <description>The public is invited to obtain information about and comment on the draft Terms Of Reference which will specify the studies to be conducted and the detailed information to be provided in the Application at several open house locations. A 30 day public comment period on the draft Terms Of Reference will start on October 29th, 2008 and end at midnight November 28th, 2008. All written comments received during this time period will be considered.</description>
      <link>http://a100.gov.bc.ca/pub/epic/apps_data/p320/1224622186627_8e248a8d30d997798d7342cf401392dbd098a6e58c83.pdf</link>
      <pubDate>Tue, 21 Oct 2008 17:11:01 -0800</pubDate>
    </item>
	
    <item>
      <title>Mica Generating Station Unit 6 Project - EAO Information Website</title>
      <description>BC Hydro is proposing to install an approximately 500 MW turbine into an existing turbine bay at the Mica Generating Station.</description>
      <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_321.html</link>
      <author>eaoinfo@gov.bc.ca</author>
      <guid isPermaLink="false">3A87EE23-DEAE-4E37-BDEC-510B28B1DC64</guid>
      <pubDate>Fri, 18 Apr 2008 16:17:25 -0800</pubDate>
      <category>Pre-Application</category>
    </item>
  </channel>
</rss>
