<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
    <channel>
        <title>Nahwitti Wind Farm Project</title>
        <description>New wind farm located 50 km NW of Port Hardy on Northern Vancouver Island. Operating 50-100 wind turbines with a capacity of 200 MW. Application submitted 16Jan2006. Waiting for additional information from Proponent.</description>
        <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_249.html</link>
        <docs>http://blogs.law.harvard.edu/tech/rss</docs>
        <lastBuildDate>Mon, 23 Jun 2008 14:52:06 -0700</lastBuildDate>
        <pubDate>Thu, 16 Dec 2004 13:16:54 -0700</pubDate>
        <webMaster>eaoinfo@gov.bc.ca</webMaster>
        <generator>FeedForAll v2.0 (2.0.2.9) unlicensed version http://www.feedforall.com</generator>
		
			<item>
	<title>Nahwitti Wind Farm Project - Public Comment and Open House on draft Application Information Requirements</title>
	<description>The public is invited to obtain information about and comment on the draft Application Information Requirements which will specify the studies to be conducted and the detailed information to be provided in the application for an environmental assessment certificate for the proposed project. An open house will be held in Port Hardy, BC. A 40 day public comment period on the draft Application Information Requirements will start on November 26, 2009 and end at midnight January 5, 2010. All comments received during this comment period in relation to the Application Information Requirements will be considered.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p249/1258655202907_5e9252f9b71ed258b7d37428ddbbbf24258ef3f79fd380371040c4b8f72a83db.pdf</link>
	<pubDate>Thu, 19 Nov 2009 13:35:00 </pubDate>
	</item>
		
        <item>
            <title>Nahwitti Wind Farm Project - EAO Information Website</title>
            <description>New wind farm located 50 km NW of Port Hardy on Northern Vancouver Island. Operating 50-100 wind turbines with a capacity of 200 MW. Application submitted 16Jan2006. Waiting for additional information from Proponent.</description>
            <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_249.html</link>
            <author>eaoinfo@gov.bc.ca</author>
            <category domain="">Pre-Application</category>
            <guid isPermaLink="false">34A69BB1-AC1C-43A4-B4D1-AF7F560B77C6</guid>
            <pubDate>Thu, 16 Dec 2004 13:18:30 -0700</pubDate>
        </item>
    </channel>
</rss>
