        <title>Narrows Inlet Hydro Project</title>
        <description>Narrows Inlet Hydro Project located in the Sechelt area. The project cluster consists of 6 interrelated projects on 5 creeks - located within a radius of 5 - 7 km, centered at the confluence of Tzoonie River and Tyson Creek.</description>
        <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_313.html</link>
        <docs>http://blogs.law.harvard.edu/tech/rss</docs>
        <lastBuildDate>Mon, 23 Jun 2008 15:07:30 -0700</lastBuildDate>
        <pubDate>Tue, 5 Feb 2008 14:01:27 -0700</pubDate>
        <webMaster>eaoinfo@gov.bc.ca</webMaster>
        <generator>FeedForAll v2.0 (2.0.2.9) unlicensed version http://www.feedforall.com</generator>
		
		
		<item>
	<title>Narrows Inlet Hydro Project (formally known as Stl'ixwim Renewable Energy Initiative)- Project Name Change </title>
	<description>On October 17, 2011, Narrows Inlet Hydro Holding Corporation (Proponent), informed the Environmental Assessment Office (EAO) that Narrows Inlet Hydro Project is the new name for the former Stl’ixwim Renewable Energy Initiative. The project name was changed because the shíshálh First Nation objected to the use of “Stl’ixwim”.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p313/1320250462018_678bf88b2f6df324d2ee15faaf38efc4538480f35890e7acf66e334986ff699c.pdf</link>
	<pubDate>Fri, 09 Nov 2011 10:20:00 </pubDate>
	</item>
		
					<item>
	<title>Narrows Inlet Hydro Project - Application Information Requirements </title>
	<description>The Environmental Assessment Office has approved the Application Information Requirements for the proposed project. The document specifies the information that must be contained in the proponent’s Application for an Environmental Assessment Certificate.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p313/1288802816690_031abcdb7a3c67dae184fa4c60704fff47e2f4f13bd00b7ec20f235b0263a0f6.pdf</link>
	<pubDate>Fri, 05 Nov 2010 15:00:00 </pubDate>
	</item>
	
		<item>
	<title>Narrows Inlet Hydro Project - Procedural Order Varied</title>
	<description>The EAO has varied the procedural order for the environmental assessment of the proposed Narrows Inlet Hydro Project.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p313/1287600887022_b5b1869c865ad30511fa9a91cfa9372985e6d4d5eb8359877da19822a4c6f6ee.pdf</link>
	<pubDate>Fri, 05 Nov 2010 15:00:00 </pubDate>
	</item>
		
								<item>
	<title>Narrows Inlet Hydro Project - Request to Join Environmental Assessment Process Granted</title>
	<description>NI Hydro Corp has eliminated the MM Creek component from its proposed Narrows Inlet Hydro Project. As a result, the total energy capacity of the proposed Project has been reduced to 49 MW of electricity, which is below the 50 MW threshold for power plants requiring an Environmental Assessment (EA) under the Reviewable Projects Regulation. The Proponent has requested to opt-in to an EA review for the proposed Project, and the request has been granted. The proposed project is currently in the pre-Application stage of the EA process.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p313/1249585392489_5f7029e3dcd4edfe7f0c5770f9da87124c7cb9657437b81ea2be660999dea596.pdf</link>
	<pubDate>Mon, 17 Aug 2009 15:20:00 </pubDate>
</item>
			<item>
	<title>Narrows Inlet Hydro Project - Draft Terms Of Reference</title>
	<description>A draft Terms of Reference which specifies the studies to be conducted and the detailed information to be provided in the Application for an Environmental Assessment Certificate is available in the Project Information Centre.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_document_313_27043.html</link>
	<pubDate>Tue, 02 Dec 2008 09:30:00 </pubDate>
	</item>
		<item>
	<title>Narrows Inlet Hydro Project - Open House and Invitation to Comment</title>
	<description>The public is invited to obtain information about and comment on the draft Terms of Reference which will specify the studies to be conducted and the detailed information to be provided in the Application at two open house locations.</description>
	<link>http://a100.gov.bc.ca/pub/epic/apps_data/p313/1228169840259_b8f6f8f4116b4873c5b48adf6c3fa27a34ee8b2597f1cb2f3b6fe28321c07e67.pdf</link>
	<pubDate>Mon, 01 Dec 2008 08:30:00 </pubDate>
	</item>
        <item>
            <title>Narrows Inlet Hydro Project - EAO Information Website</title>
            <description>Narrows Inlet Hydro Project located in the Sechelt area. The project cluster consists of 6 interrelated projects on 5 creeks - located within a radius of 5 - 7 km, centered at the confluence of Tzoonie River and Tyson Creek.</description>
            <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_313.html</link>
            <author>eaoinfo@gov.bc.ca</author>
            <category domain="">Pre-Application</category>
            <guid isPermaLink="false">44E9CDB2-D0E5-4B8D-8E2C-09ED1D4F5BB4</guid>
            <pubDate>Tue, 5 Feb 2008 14:08:47 </pubDate>