    <description>Proponent proposes to construct 35 - 2.0 MW wind turbines, an interconnecting collector system, a substation, access roads, and an overhead transmission line to connect to the existing BCTC substation at Spencers Bridge.</description>
    <generator>mirabyte Feed Writer 1.0</generator>
    <item>
      <title>Begins Environmental Assessment Process</title>
      <description>Proponent proposes to construct 35 - 2.0 MW wind turbines, an interconnecting collector system, a substation, access roads, and an overhead transmission line to connect to the existing BCTC substation at Spencers Bridge.</description>
      <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_340.html</link>
      <pubDate>Thu, 20 Nov 2008 10:54:28 -0800</pubDate>
    </item>
			    <item>
      <title>Nicomen Wind Energy Project - will require EA Certificate</title>
      <description>The Environmental Assessment Office has determined the Nicomen Wind Energy Project will require an Environmental Assessment Certificate prior to commencing.</description>
      <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_doc_list_340_p_com.html</link>
      <pubDate>Thu, 20 Nov 2008 15:15:50 -0800</pubDate>
    </item>