<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
    <channel>
        <title>Shovel_Creek_Waterpower_Project</title>
        <description>One of four hydroelectric projects being reviewed concurrently (with Statlu Creek, Tretheway Creek and Big Silver Creek). Aggregate nameplate capacity is 79MW.</description>
        <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_327.html</link>
        <docs>http://blogs.law.harvard.edu/tech/rss</docs>
        <lastBuildDate>Mon, 23 Jun 2008 15:06:22 -0700</lastBuildDate>
        <pubDate>Wed, 18 Jun 2008 15:05:26 -0700</pubDate>
        <webMaster>eaoinfo@gov.bc.ca</webMaster>
        <generator>FeedForAll v2.0 (2.0.2.9) unlicensed version http://www.feedforall.com</generator>
		
		<item>
      <title>Shovel Creek Waterpower Project - Public Comment Period Closed </title>
      <description>The proposed Shovel Creek Waterpower Project’s public comment period regarding the Cloudworks Energy Inc.’s application for an environmental assessment certificate has now closed. The EAO posts public comments and the proponent’s responses to the issues raised in the electronic project information centre (e-PIC).</description>
      <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_doc_list_327_r_pub.html</link>
      <pubDate>Fri, 10 Feb 2012 09:12:13 -0800</pubDate>
    </item>
		
	<item>
	<title>Shovel Creek Waterpower Project - Public Comment and Open House on Application</title>
	<description> The public is invited to obtain information about and comment on the application for an environmental assessment certificate for the proposed project. An open house will be held in Chilliwack on January 19, 2012. A 30 day public comment period on the application will start on January 11, 2012, and end on February 9, 2012. All written comments received by online form, fax or mail during this time period in relation to the application will be considered.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p327/1325717461060_983058afdbd116144fbb863d66e6bb9b1eac313085c9990714243c4a407674b0.pdf</link>
	<pubDate>Wed, 04 Jan 2012 15:15:00 </pubDate>
	</item>
		
		<item>
	<title>Shovel Creek Waterpower Project - Application for an Environmental Assessment Certificate</title>
	<description>The Environmental Assessment Office has formally accepted an Application from Cloudworks Energy Inc. for an environmental assessment certificate for the proposed Shovel Creek Waterpower Project on the basis that the Application contains the information required by the Application Information Requirements. The Application review process has begun. </description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_doc_list_327_r_app.html</link>
	<pubDate>Wed, 04 Jan 2012 14:15:00 </pubDate>
	</item> 
	
			
			
		<item>
	<title>Shovel Creek Water Power Project  - Application Information Requirements </title>
	<description>The Environmental Assessment Office has approved the  Application Information Requirements for the proposed project. The document  specifies the information that must be contained in the proponent’s Application  for an Environmental Assessment Certificate.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_document_327_33505.html</link>
	<pubDate>Wed, 06 Jul 2011 12:00:00  </pubDate>
	</item>
		
					<item>
	<title>Shovel Creek Waterpower Project - Public Comment Period Closed</title>
	<description>The proposed Shovel Creek Waterpower Project’s public comment period regarding the draft Application Information Requirements has now closed. The EAO posts all the public comments it receives and the proponent’s responses to those comments. An additional public comment period will be held after Cloudworks Energy Inc. submits its application for an environmental assessment certificate.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_doc_list_327_p_pub.html</link>
	<pubDate>Thu, 26 Nov 2010 09:30:00  </pubDate>
	</item>
		
		<item>
	<title>Shovel Creek Waterpower Project - Public Comment and Open House on Draft Application Information Requirements</title>
	<description>The public is invited to obtain information about and comment on the draft Application Information Requirements which will specify the detailed information to be provided in the application for an environmental assessment certificate for the proposed project. An Open house will be held in Chilliwack BC. A 30 day public comment period on the draft Application Information Requirements will start on October 27, 2010 and end on November 25, 2010. All written comments received by online form, fax or mail during this comment period in relation to the draft Application Information Requirements will be considered. </description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p328/1288026818185_4b14232f49a20a8840b96b571c081f707071f339a57ac4cf0b38b4acf4d8724a.pdf</link>
	<pubDate>Mon, 25 Oct 2010 12:00:00 </pubDate>
	</item>
	
	<item>
	<title>Shovel Creek Waterpower Project - Draft Application Information Requirements</title>
	<description>Draft Application Information Requirements for the Proposed Tretheway Creek Waterpower Project submitted by Cloudworks Energy Inc. and dated October 27, 2010 (also contains DAIR for the proposed Statlu, Tretheway and Big Silver Creek Waterpower Projects) </description>
	<link>https://a100.gov.bc.ca/pub/epic/apps_data/p328/1288029279201_dae91c63d35a40d5269c1f54d3dfc56b4b39fe49b76eaeb8bd61df3f0875f04b.pdf</link>
	<pubDate>Mon, 25 Oct 2010 12:00:00 </pubDate>
	</item>
	
		<item>
	<title>Shovel Creek Waterpower Project - Procedural Order Issued</title>
	<description>The EAO has issued a procedural order that establishes the formal scope, procedures and methods concerning the environmental assessment for the proposed Shovel Creek Waterpower Project. </description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p327/1276729177748_54cb30f4de9ebcd75ea170a6651344549def8073c776305f5123f8a812cd99fb.pdf</link>
	<pubDate>Tues, 15 Jun 2010 12:00:00 </pubDate>
	</item>
	
	<item>
	<title>Shovel Creek Waterpower Project - Begins Environmental Assessment Process</title>
	<description>Cloudworks Energy Inc. has entered into the environmental assessment process with the proposed Shovel Creek Waterpower Project</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p327/1213917613542_8e248a8d30d9388870125b684026aa0bbaac78377955.pdf</link>
	<pubDate>Fri, 18 Jun 2008 12:00:00 </pubDate>
	</item>
		
	<item>
	<title>Shovel Creek Waterpower Project - Revised - Request to Join Environmental Assessment Process Granted</title>
	<description>The Shovel Creek Waterpower Project proposed by Cloudworks Energy Inc. does not constitute a reviewable project under the Act or its regulations. The EAO, however, has granted an application by the proponent to designate the proposed project as a reviewable project. The proposed project has entered the environmental assessment process.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p327/1213917549048_8e248a8d30d9388870125b684026aa0bbaac78377955.pdf</link>
	<pubDate>Fri, 18 Jun 2008 12:00:00 </pubDate>
	</item>
	
	<item>
	<title>Shovel Creek Waterpower Project - Request to Join Environmental Assessment Process Granted</title>
	<description>The Shovel Creek Waterpower Project proposed by Cloudworks Energy Inc. does not constitute a reviewable project under the Act or its regulations. The EAO, however, has granted an application by the proponent to designate the proposed project as a reviewable project. The proposed project has entered the environmental assessment process.</description>
	<link>http://a100.gov.bc.ca/appsdata/epic/documents/p327/1213917456944_8e248a8d30d9388870125b684026aa0bbaac78377955.pdf</link>
	<pubDate>Tues, 22 Jan 2008 12:00:00 </pubDate>
	</item>
	
        <item>
            <title>Shovel Creek Waterpower Project - EAO Information Website</title>
            <description>One of four hydroelectric projects being reviewed concurrently (with Statlu Creek, Tretheway Creek and Big Silver Creek). Aggregate nameplate capacity is 79MW.</description>
            <link>http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_project_home_327.html</link>
            <author>eaoinfo@gov.bc.ca</author>
            <category domain="">Pre-Application</category>
            <guid isPermaLink="false">0AB27A77-3E5B-4C31-9E23-12BF3C7461B6</guid>
            <pubDate>Fri, 18 Jan 2008 15:04:45 -0700</pubDate>
        </item>
    </channel>